Portfolio — 2026

Industrial Engineer.I build things that move.

From composite structures and motorsport to industrial systems and digital products.

Donostia, SpainIndustrial EngineeringMotorsportDigital Products
Portrait — Alicia Serrano Martínez

01 — Introduction

An engineer with a multidisciplinary mindset.

I enjoy working where disciplines overlap — designing physical systems, solving engineering problems, building software and turning ideas into useful products.

Mechanical thinking. Digital execution. Real-world constraints.

02 — Selected work

Four projects, one throughline.

012025

PitMonkey FS

Building a digital home for Formula Student.

A platform connecting Formula Student teams, members, cars, competitions and results in one place.

Flutter · Dart · Supabase · Figma · AI

PitMonkey FS logo

Designed and built independently.

View PitMonkey FS
PitMonkey FS — car profile and competition data
PitMonkey FS — team and vehicle interface
Mobile product · Flutter
PitMonkey FS interface overview
PitMonkey FS app icon and download badges
Tecnun eRacing Formula Student car
022021 — 2024

Tecnun eRacing

Engineering a carbon-fibre monocoque.

Designed and developed composite structures for a Formula Student race car, combining structural design, simulation, optimisation and manufacturing.

Final Degree Project — design and optimization of PAHT CF15 3D-printed inserts for a carbon-fibre monocoque, optimized using Altair OptiStruct.

  • Composite Structures
  • FEA / optimisation
  • CAD
  • Manufacturing
Carbon-fibre monocoque
Embedded load-distribution inserts in the monocoque
CAD model — packaging and volumes
Sandwich panel bending simulation
Static structural stress analysis
032025

Project Management for Simulator Systems

Turning complex engineering projects into a usable digital workflow.

A web platform developed during my Master's Final Project to manage simulator projects, systems, zones, tablets and technical information.

  • React
  • ASP.NET Core
  • C#
Lander project management dashboard
Lander simulator project detail interface
Lander platform architecture and data flow
Simulator system layout
Simulator cab environment
SAPA transmission unit on display
04Summer 2024

SAPA Transmission

Engineering inside a real manufacturing environment.

An engineering internship built around rotations through R&D and product design, machining, assembly and validation — the full path from a drawing to a part that passes.

  • Industrial Engineering
  • Manufacturing
  • Product Development

03 — Engineering archive

Engineering, beyond the main projects.

A collection of problems, prototypes and technical work developed throughout my engineering studies and projects.

REAL PROJECT IMAGE — CAD or mechanical design

Mechanical design

REAL PROJECT IMAGE — Prototype or manufactured component

Manufacturing

REAL PROJECT IMAGE — Laboratory or composite testing

Composite design

REAL PROJECT IMAGE — Structural simulation / FEA

Simulation

04 — Experience

A path, not a list.

  1. Sirkum Ingenieros

    Current

    Project Engineer

    Engineering projects in industrial environments, with a focus on project development and technical problem solving.

    2026 — Present

  2. Lander Simulation & Training Solutions

    Master's Final Project

    Integrated web platform for managing simulator projects.

    Jun 2025 — Dec 2025

  3. SAPA Transmission

    Engineering Internship

    Rotations through R&D and product design, machining, assembly and validation.

    Summer 2024

  4. Tecnun eRacing / Formula Student

    Chassis Team Lead

    Head of Chassis for the 2022–23 and 2023–24 seasons.

    2022 — 2024

  5. Tecnun eRacing

    Chassis Team Member

    Chassis development and composite structures.

    2021 — 2022

05 — Toolkit

A technical index.

Physical

01
  • Composite structures
  • CAD
  • FEA
  • Manufacturing
  • Mechanical design

Digital

02
  • Flutter
  • Dart
  • C#
  • React
  • Supabase
  • Python

Product

03
  • UI/UX
  • Figma
  • Prototyping
  • AI-assisted development

06 — Education

  1. Master's Degree

    Industrial Technologies Engineering

    Tecnun — University of Navarra

    HaaS Talent Scholarship

    2024 — 2025

  2. Bachelor's Degree

    Industrial Technologies Engineering

    Tecnun — University of Navarra

    Alumni Scholarship for Academic Excellence

    2020 — 2024

  3. Exchange Semester

    Linköping University

    Sweden

    2023 — 2024

07 — Formula Student

Built under pressure. Tested in reality.

Where composite structures, software, industrial work and team decisions meet real deadlines. Formula Student is where engineering stops being theoretical.

  • 01Engineering development
  • 02Composite structures
  • 03Testing
  • 04Technical decision-making
  • 05Team leadership
  • 06Defending decisions in competition
FS / 01Car on track
Alicia at a Formula Student competition
FS / 02
FS / 03Monocoque detail
FS / 04Workshop / layup
FS / 05Competition / paddock

08 — Recognition & milestones

  • HaaS Talent Scholarship — Master's
  • Alumni Scholarship for Academic Excellence
  • Fostering Talent Programme
  • Outstanding academic record
  • Formula Student chassis leadership

09 — Languages

Beyond the technical.

Based in San Sebastián, working across languages as easily as across disciplines — useful in international teams, competition paddocks and engineering rooms alike.

Spanish
Native
English
C1
Basque
B2
French
Basic

10 — Beyond engineering

Beyond engineering.

Curious by nature, I spend as much time exploring outside the workshop as I do inside it.

Alicia at a mountain summit in the Basque Country

Basque Country

Frozen winter portrait in Lapland

Cold as it gets

Diving into a Norwegian fjord

Norway

Close-up with a reindeer in the snow

Exploring somewhere new

Snorkelling by the coast

Outside the workshop

Kayak trip on a Norwegian fjord with friends

Always moving

Night snowshoe hike with friends in Norway

Friends & expeditions

With sled dogs in the snow

Lapland

11 — Contact

Let's build something.

Open to interesting engineering, product and technology challenges.

LinkedInProfile link — to be added